Hi All
I try to use greenwave NP310-F PowerNode (6-plug.
Openhab2 shows GWPN6 Multi-socket PowerNode (6-plug) I hope is the same.
I have I few problems with this device.
- Openhab2 shows 7 nodes… switch, switch1,…switch6 but devices has only 6 switches…
2.After openhab2 restart openhab2 shows all switches off - Electric meter (watts) and (kWh) update very, very slowly and no for all nodes
Anyone has experience with this device under openhab2 ???