I have a Qubino 3-Phase Meter and the BICOM432-40-WM1 Switch
Parameter 7 ist set to 3
Parameter 100 ist set to 1
The Qubino was removed and re-insertet to the z-Wave Binding after the parameter was set.
I am missing the new Items to switch the BICOM.
I have OpenHAB 2.5 (Stable)
—>>From your phase meter you will get the energy consumption, trigger on a certain level and command a switch on your BICOM.
This ist just my Problem. How can i switch the BICOM. The 3-Phase-Meter give the command by IR to the BICOM. But how i can bring OpenHAB to send this on/off Command.
By default, endpoint 3, which corresponds to
this relay, is hidden and can be enabled by changing the value of the configuration parameter
100
From what I understand, when the BICOM was added after your initial inclusion, the Qubino needs to be excluded and included again.
Then it should react as a slave on endpoint 3.